We got these two homemade 4x2x2 cages in a trade we were very happy with, even though they were quite rough and have needed a number of weekends worth of work and a good bit of money sunk into them. They are finally nearly finished though! My husband has done almost all of the work on them and has done a great job. We replaced the plexi glass in the doors with Lexan, sanded, repainted, caulked and just today put on the bottom liner. Still have to finish rehanging the doors, installing the Radiant Heat panels we've decided on, the LED light bars we've found and hanging the neat drift wood that came with the one cage in a way that it can be removed for cleaning. Plus we want to find something similar that we can do in the other cage. Figuring they are going to need at least a month or more to off gas as well before we can move Kaylee and Zoe into them.
This is the original before any restoration work.
Floor removed and some sanding complete.
All sanding complete with handles installed. Much easier to move!
Partially painted. About the only part I helped with.
All painting complete!
Floor complete and waiting to dry. Used herculiner to protect the floor.
Will continue to update as this project comes along.